¾” connection with included spray nozzle. 16′ corded plug.
Easily transfer RYDLYME into a cooling tower or evaporative condenser basin. 28GPM at 15′ of head.
Variable speed control is easily accessible on the top of the 75LDP.
After RYDLYME is transferred into the basin, use the 75LDP to focus on stubborn scale areas. Make sure to spray back in to the basin.
The spray can be focused on internal basin parts or external fill to remove scale easily.
RYDLYME has been proven for over 80 years! NSF/ANSI/CAN 60 certified. Manufactured in an ISO certified facility.
Data centers, hospitals, universities, manufacturing, etc. – all trust RYDLYME. Our knowledgable technicians will size up your cooling tower.
Manufactured to last.
The RYDLYME Cooling Tower Cleaning Kit is a robust system that allows RYDLYME to be transferred into a cooling tower/evaporative condenser basin for circulation – using the same pump, can be used to target problem scale areas. Proudly manufactured in an ISO 9001 Certified Facility in the USA.